Sum of Jira point and time estimates for columns and total for sprint
Displays a sum of estimates (works for both points and time) at the top of each column and a total next to the sprint title.
Works with:
- Classic Scrum Board (both points and time estimates)
- Next Gen Scrum Board
For time estimates it takes Jira defaults - 60 minutes, 8 hours, 5 days.
Feature requests, issues and suggestions welcome at https://github.com/filip-savic/jira-estimates-sum-chrome-ext
Latest reviews
- (2020-09-30) Awesome!
- (2020-09-23) Danijel Scuric: Very useful, just what I needed.